Interim report, November 30, 1981 /
This study was conducted to evaluate the merits of developing power by diversion of water southeasterly to the McArthur River through a 10-mile long tunnel or easterly down the Chakachatna Valley either by a 12-mile tunnel or by dam and tunnel.
Saved in:
Alternate Title: | Alaska Power Authority, Anchorage, Alaska, Chakachamna Hydroelectric Project. Interim report, November 30, 1981 |
---|---|
Corporate Contributor(s): | Bechtel Civil & Minerals Inc. Alaska Power Authority. |
Publisher: | Bechtel Civil & Minerals, Inc., |
Report Numbers: | APA 533 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 533. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 02680cam a2200529Ia 4500 | ||
---|---|---|---|
001 | 1507438 | ||
003 | SIRSI | ||
005 | 20140115120700.0 | ||
007 | cr cn||||a|||| | ||
008 | 830627s1981 cauabd bt s000 0 eng d | ||
035 | |a (OCoLC)41703883 | ||
040 | |a Ak |c ALK |d RLA |d OCLCO |d RLA | ||
049 | |a RLAA | ||
050 | 4 | |a TK1425.C53 |b B425 1981 | |
050 | 4 | |a TK1425.S8 |b A23 no. 533 | |
088 | |a APA 533 | ||
245 | 0 | 0 | |a Interim report, November 30, 1981 / |c Bechtel Civil & Minerals, Inc. |
246 | 3 | |a Alaska Power Authority, Anchorage, Alaska, Chakachamna Hydroelectric Project. |p Interim report, November 30, 1981 | |
260 | |a San Francisco : |b Bechtel Civil & Minerals, Inc., |c [1981] | ||
300 | |a 350 leaves in various foliations : |b ill., maps, charts ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
500 | |a At head of title: Alaska Power Authority, Anchorage, Alaska, Chakachamna Hydroelectric Project. | ||
510 | 3 | |a Assigned APA Document no. 533 in the Susitna Hydroelectric Project document index. This report was used as supporting documentation in research by the Susitna Hydroelectric Project. | |
530 | |a Available also in electronic format on the Internet. | ||
536 | |g Job 14879 | ||
520 | |a This study was conducted to evaluate the merits of developing power by diversion of water southeasterly to the McArthur River through a 10-mile long tunnel or easterly down the Chakachatna Valley either by a 12-mile tunnel or by dam and tunnel. | ||
504 | |a Includes bibliographical references (p. 3-13 - 3-14, 5-75 - 5-82, and 6-150 - 6-156). | ||
610 | 2 | 0 | |a Chakachamna Hydroelectric Project. |
650 | 0 | |a Water-power |z Alaska |z Chakachamna Lake |x Planning. | |
650 | 0 | |a Electric power production |z Alaska |z Chakachamna Lake Region |x Planning. | |
650 | 0 | |a Hydroelectric power plants |z Alaska |z Chakachamna Lake |x Planning. | |
650 | 0 | |a Hydroelectric power plants |z Alaska |z Chakachatna River |x Planning. | |
650 | 0 | |a Hydroelectric power plants |z Alaska |z McArthur River |x Planning. | |
650 | 0 | |a Dams |z Alaska |z Chakachamna Lake |x Planning. | |
651 | 0 | |a Chakachamna Lake (Alaska) |x Power utilization |x Planning. | |
651 | 0 | |a McArthur River (Alaska) |x Power utilization |x Planning. | |
710 | 2 | |a Bechtel Civil & Minerals Inc. | |
710 | 2 | |a Alaska Power Authority. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 533. |5 AkARLIS. | |
043 | |a n-us-ak | ||
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/5/APA533.pdf |z Size: 31 MB. |z ARLIS Document Server |
977 | |a o41703883 | ||
901 | |a 0972 |c TK1425.C53B425 1981@ADF&G | ||
596 | |a 9 10 23 | ||
098 | |a APA 00533 |