Interim report, November 30, 1981 /

This study was conducted to evaluate the merits of developing power by diversion of water southeasterly to the McArthur River through a 10-mile long tunnel or easterly down the Chakachatna Valley either by a 12-mile tunnel or by dam and tunnel.

Saved in:
Bibliographic Details
Alternate Title:Alaska Power Authority, Anchorage, Alaska, Chakachamna Hydroelectric Project. Interim report, November 30, 1981
Corporate Contributor(s):Bechtel Civil & Minerals Inc.

Alaska Power Authority.
Publisher:Bechtel Civil & Minerals, Inc.,
Report Numbers:APA 533
Series:Document (Susitna Hydroelectric Project) ; no. 533.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 02680cam a2200529Ia 4500
001 1507438
003 SIRSI
005 20140115120700.0
007 cr cn||||a||||
008 830627s1981 cauabd bt s000 0 eng d
035 |a (OCoLC)41703883 
040 |a Ak  |c ALK  |d RLA  |d OCLCO  |d RLA 
049 |a RLAA 
050 4 |a TK1425.C53  |b B425 1981 
050 4 |a TK1425.S8  |b A23 no. 533 
088 |a APA 533 
245 0 0 |a Interim report, November 30, 1981 /  |c Bechtel Civil & Minerals, Inc. 
246 3 |a Alaska Power Authority, Anchorage, Alaska, Chakachamna Hydroelectric Project.  |p Interim report, November 30, 1981 
260 |a San Francisco :  |b Bechtel Civil & Minerals, Inc.,  |c [1981] 
300 |a 350 leaves in various foliations :  |b ill., maps, charts ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
500 |a At head of title: Alaska Power Authority, Anchorage, Alaska, Chakachamna Hydroelectric Project. 
510 3 |a Assigned APA Document no. 533 in the Susitna Hydroelectric Project document index. This report was used as supporting documentation in research by the Susitna Hydroelectric Project. 
530 |a Available also in electronic format on the Internet. 
536 |g Job 14879 
520 |a This study was conducted to evaluate the merits of developing power by diversion of water southeasterly to the McArthur River through a 10-mile long tunnel or easterly down the Chakachatna Valley either by a 12-mile tunnel or by dam and tunnel. 
504 |a Includes bibliographical references (p. 3-13 - 3-14, 5-75 - 5-82, and 6-150 - 6-156). 
610 2 0 |a Chakachamna Hydroelectric Project. 
650 0 |a Water-power  |z Alaska  |z Chakachamna Lake  |x Planning. 
650 0 |a Electric power production  |z Alaska  |z Chakachamna Lake Region  |x Planning. 
650 0 |a Hydroelectric power plants  |z Alaska  |z Chakachamna Lake  |x Planning. 
650 0 |a Hydroelectric power plants  |z Alaska  |z Chakachatna River  |x Planning. 
650 0 |a Hydroelectric power plants  |z Alaska  |z McArthur River  |x Planning. 
650 0 |a Dams  |z Alaska  |z Chakachamna Lake  |x Planning. 
651 0 |a Chakachamna Lake (Alaska)  |x Power utilization  |x Planning. 
651 0 |a McArthur River (Alaska)  |x Power utilization  |x Planning. 
710 2 |a Bechtel Civil & Minerals Inc. 
710 2 |a Alaska Power Authority. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 533.  |5 AkARLIS. 
043 |a n-us-ak 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/5/APA533.pdf  |z Size: 31 MB.  |z ARLIS Document Server 
977 |a o41703883 
901 |a 0972  |c TK1425.C53B425 1981@ADF&G 
596 |a 9 10 23 
098 |a APA 00533