Interim report, November 30, 1981 /

This study was conducted to evaluate the merits of developing power by diversion of water southeasterly to the McArthur River through a 10-mile long tunnel or easterly down the Chakachatna Valley either by a 12-mile tunnel or by dam and tunnel.

Saved in:
Bibliographic Details
Alternate Title:Alaska Power Authority, Anchorage, Alaska, Chakachamna Hydroelectric Project. Interim report, November 30, 1981
Corporate Contributor(s):Bechtel Civil & Minerals Inc.

Alaska Power Authority.
Publisher:Bechtel Civil & Minerals, Inc.,
Report Numbers:APA 533
Series:Document (Susitna Hydroelectric Project) ; no. 533.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:This study was conducted to evaluate the merits of developing power by diversion of water southeasterly to the McArthur River through a 10-mile long tunnel or easterly down the Chakachatna Valley either by a 12-mile tunnel or by dam and tunnel.
Physical Description:350 leaves in various foliations : ill., maps, charts ; 28 cm.
Notes:At head of title: Alaska Power Authority, Anchorage, Alaska, Chakachamna Hydroelectric Project.
Bibliography:Includes bibliographical references (p. 3-13 - 3-14, 5-75 - 5-82, and 6-150 - 6-156).