Evaluation of alternative flow requirements : report /

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project. Evaluation of alternative flow requirements : report
Corporate Contributor(s):United States. Federal Energy Regulatory Commission.

Susitna Hydroelectric Project.

Alaska Power Authority.

HARZA-EBASCO Susitna Joint Venture.
Publisher:Alaska Power Authority,
Report Numbers:APA 2430

SUS 429

SUS 441
Series:Document (Susitna Hydroelectric Project) ; no. 2430.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
LEADER 02847cam a2200637Ia 4500
001 1507431
003 SIRSI
005 20120829082748.0
007 cr cn||||a||||
007 he bmu---bbca
008 900501s1984 akua bt s000 0 eng d
019 |a 52510118 
035 |a (Sirsi) CCL7383 
035 |a (OCoLC)21464018  |z (OCoLC)52510118 
040 |a UDA  |c UDA  |d OCLCQ  |d RLA  |d ALK 
049 |a ALKA 
082 0 4 |a 333.914/09798/3  |2 19 
088 |a APA 2430 
088 |a SUS 429 
088 |a SUS 441 
090 |a TK1425.S8  |b F472 no. 2430 
090 |a TK1425.S8  |b F58 1984 
245 0 0 |a Evaluation of alternative flow requirements :  |b report /  |c by Harza-Ebasco Susitna Joint Venture ; prepared for Alaska Power Authority. 
246 3 |a Susitna Hydroelectric Project.  |p Evaluation of alternative flow requirements :  |b report 
260 |a [Anchorage, Alaska] :  |b Alaska Power Authority,  |c [1984] 
300 |a iii, 55 leaves :  |b ill. ;  |c 28 cm. 
337 |a computer  |2 rdamedia 
338 |a online resource  |2 rdacarrier 
490 1 |a Document ;  |v no. 2430 
500 |a At head of title: Susitna Hydroelectric Project. 
500 |a "Susitna File no. 4.3.4.1." 
500 |a "Federal Energy Regulatory Commission project no. 7114"--Cover. 
500 |a Cover and t.p. of copies with blue cover are dated "November 1984." 
500 |a Some copies distributed without cover and with different t.p. (That t.p. is dated "October 1984" and has no Susitna File number; and some copies of that version have no Document series statement). The body of the report looks identical. 
504 |a Includes bibliographical references (leaf 55). 
510 3 |a Assigned APA document no. 2430 in Susitna Hydroelectric Project document index. 
510 3 |a Assigned SUS document no. 429 in the AEIDC index. Also assigned no. 441 (duplicate number). 
513 |a Final report. 
530 |a Available also in microfiche format and electronic format on the Internet. 
610 2 0 |a Susitna Hydroelectric Project. 
650 0 |a Stream measurements  |z Alaska  |z Susitna River Watershed. 
710 1 |a United States.  |b Federal Energy Regulatory Commission. 
710 2 |a Susitna Hydroelectric Project. 
710 2 |a Alaska Power Authority. 
710 2 |a HARZA-EBASCO Susitna Joint Venture. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 2430. 
043 |a n-us-ak 
596 |a 9 10 11 23 24 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/24/APA2430.pdf  |y Report as distributed with cover.  |z ARLIS Document Server 
856 4 2 |u https://www.arlis.org/docs/vol1/Susitna/24/APA2430a.pdf  |y Some copies have this alternative t.p. without cover.  |z ARLIS Document Server 
977 |a o21464018 
901 |a 0104  |c TC175.E92 1984 
901 |a 3755 
098 |a SUS 00429 
098 |a SUS 00441 
098 |a APA 02430