Instream ice simulation study /

"The objective of these studies is to determine the effect of the proposed Watana and Devil Canyon Dams on river ice processes and the corresponding water surface elevations during the winter season in the Susitna River downstream of the dams."--Page 1-1.

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project. Instream ice simulation study
Corporate Contributor(s):United States. Federal Energy Regulatory Commission.

Susitna Hydroelectric Project.

Alaska Power Authority.

HARZA-EBASCO Susitna Joint Venture.
Publisher:Alaska Power Authority,
Report Numbers:APA 1986

SUS 434
Edition:[Final].
Series:Document (Susitna Hydroelectric Project) ; no. 1986.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 03014cam a2200589Ia 4500
001 1506890
003 SIRSI
005 20140109112431.0
007 he bmu---bbca
007 cr bn||||a||||
008 900501s1984 akuad bt s000 0 eng d
035 |a (OCoLC)21463082 
040 |a UDA  |b eng  |c UDA  |d RLA  |d OCLCQ  |d OCLCA  |d RLA 
049 |a RLAA 
050 4 |a TK1425.S8  |b F472 no. 1986 
050 4 |a TK1425.S8  |b I343 1984 
088 |a APA 1986 
088 |a SUS 434 
245 0 0 |a Instream ice simulation study /  |c report by Harza-Ebasco Susitna Joint Venture ; prepared for Alaska Power Authority. 
246 3 |a Susitna Hydroelectric Project.  |p Instream ice simulation study 
250 |a [Final]. 
260 |a [Anchorage, Alaska] :  |b Alaska Power Authority,  |c [1984] 
300 |a 701 p. in various pagings :  |b ill. ;  |c 28 cm. 
337 |a unmediated  |b n  |2 rdamedia 
490 1 |a Document ;  |v no. 1986 
500 |a Chiefly graphs. 
500 |a At head of title: Susitna Hydroelectric Project. 
513 |a Final report. 
500 |a "October 1984." 
500 |a "Susitna file no. 42.2.5." 
500 |a "Federal Energy Regulatory Commission Project no. 7114"--Cover. 
510 3 |a Assigned APA document no. 1986 in Susitna Hydroelectric Project document index. 
510 3 |a Assigned SUS document number 434 in the Susitna Aquatic Impact Assessment Project bibliography. 
500 |a The document that contains errata makes mention to this report as transmitted to FERC on November 2, 1984. It is assumed that that reference indicates when the final report was forwarded on that date, but that the report described here with the October 1984 publication date is the corresponding report. 
530 |a Available also in microfiche format and electronic format on the Internet. 
520 |a "The objective of these studies is to determine the effect of the proposed Watana and Devil Canyon Dams on river ice processes and the corresponding water surface elevations during the winter season in the Susitna River downstream of the dams."--Page 1-1. 
504 |a Includes bibliographical references (p. 5-1 - 5-2). 
650 0 |a Ice on rivers, lakes, etc.  |z Alaska  |z Susitna River  |x Simulation methods. 
610 2 0 |a Susitna Hydroelectric Project. 
710 1 |a United States.  |b Federal Energy Regulatory Commission. 
710 2 |a Susitna Hydroelectric Project. 
710 2 |a Alaska Power Authority. 
710 2 |a HARZA-EBASCO Susitna Joint Venture. 
787 0 8 |i Has corrections:  |t Refinement to reservoir and river temperature and ice studies for simulation period October 1976 to May 1977.  |d [Anchorage, Alaska : Harza-Ebasco, 1985]  |r SUS 491  |w (OCoLC)858576039 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 1986. 
043 |a n-us-ak 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/19/APA1986.pdf  |z ARLIS Document Server 
901 |a 3755 
901 |a 0057  |c ALASKA GB1398.4.A4I57 1984 
596 |a 9 10 11 23 24 
098 |a SUS 00434 
098 |a APA 01986