Instream ice simulation study /

"The objective of these studies is to determine the effect of the proposed Watana and Devil Canyon Dams on river ice processes and the corresponding water surface elevations during the winter season in the Susitna River downstream of the dams."--Page 1-1.

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project. Instream ice simulation study
Corporate Contributor(s):United States. Federal Energy Regulatory Commission.

Susitna Hydroelectric Project.

Alaska Power Authority.

HARZA-EBASCO Susitna Joint Venture.
Publisher:Alaska Power Authority,
Report Numbers:APA 1986

SUS 434
Edition:[Final].
Series:Document (Susitna Hydroelectric Project) ; no. 1986.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:"The objective of these studies is to determine the effect of the proposed Watana and Devil Canyon Dams on river ice processes and the corresponding water surface elevations during the winter season in the Susitna River downstream of the dams."--Page 1-1.
Physical Description:701 p. in various pagings : ill. ; 28 cm.
Notes:Chiefly graphs.

At head of title: Susitna Hydroelectric Project.

"October 1984."

"Susitna file no. 42.2.5."

"Federal Energy Regulatory Commission Project no. 7114"--Cover.

The document that contains errata makes mention to this report as transmitted to FERC on November 2, 1984. It is assumed that that reference indicates when the final report was forwarded on that date, but that the report described here with the October 1984 publication date is the corresponding report.
Report Type:Final report.
Related Titles:Has corrections: Refinement to reservoir and river temperature and ice studies for simulation period October 1976 to May 1977. [Anchorage, Alaska : Harza-Ebasco, 1985] SUS 491
Bibliography:Includes bibliographical references (p. 5-1 - 5-2).