%0 Book %I Alaska Power Authority %D 1984 %C Anchorage, Alaska %G English %B Document (Susitna Hydroelectric Project) ; %T Habitat management methods to increase moose browse production in Alaska : a review, synthesis, and annotated bibliography of available information : report %U https://www.arlis.org/docs/vol1/Susitna/20/APA2046.pdf %X Construction of the Susitna Hydroelectric Project will eliminate or alter wildlife habitat in the Susitna River drainage. Mitigation will include designating specific lands for habitat compensation and then increasing and/or maintaining moose carrying capacity through habitat management techniques. Prescribed burning is the preferred techniques to increase the carrying capacity of most areas for moose.