Weekly flow duration curves and observed and filled weekly flows for the Susitna River Basin : report /

"Flow duration curves were derived for natural and with-project conditions for the Susitna River at Gold Creek, Sunshine, and Susitna Stations."--P. 1-1.

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project. Weekly flow duration curves and observed and filled weekly flows for the Susitna River Basin
Corporate Contributor(s):United States. Federal Energy Regulatory Commission.

Alaska Power Authority.

Susitna Hydroelectric Project.

HARZA-EBASCO Susitna Joint Venture.
Publisher:Alaska Power Authority,
Report Numbers:APA 2318

SUS 435
Series:Document (Susitna Hydroelectric Project) ; no. 2318.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:"Flow duration curves were derived for natural and with-project conditions for the Susitna River at Gold Creek, Sunshine, and Susitna Stations."--P. 1-1.
Physical Description:289 p. in various pagings : ill., map 28 cm.
Notes:Chiefly tables.

At head of title: Susitna Hydroelectric Project.

"Federal Energy Regulatory Commission project no. 7114"--Cover.

"Susitna file no. 4.2.1."

"October 1984."
Report Type:Final report.
Bibliography:Includes bibliographical references.