Environmental studies. Subtask 7.12, Plant ecology studies. Phase II, Draft final report /
Vegetation types as they relate to moose habitat studied in the middle Susitna River basin were studied between May 31 and Sept. 20, 1982. The three studies were: 1) plant phenology and moose utilization study, 2) pre-burn inventory and assessment of vegetation in Alphabet Hills, and 3) inventory of...
Saved in:
Alternate Title: | Environmental studies. Subtask 7.12, Plant ecology studies. Phase 2, Draft final report Alaska Power Authority, Susitna Hydroelectric Project. Environmental studies. Subtask 7.12, Plant ecology studies. Phase II, Draft final report Subtask 7.12, Plant ecology studies. Phase II, Draft final report Plant ecology studies. Phase II, Draft final report |
---|---|
Additional Author(s): | Steigers, William D. Helm, Dot. Mayer, Patrick V. MacCracken, James G. |
Corporate Contributor(s): | Alaska Power Authority. LGL Alaska Research Associates. Susitna Hydroelectric Project. |
Publisher: | [Alaska Power Authority?], |
Report Numbers: | APA 3516 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 3516. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Summary: | Vegetation types as they relate to moose habitat studied in the middle Susitna River basin were studied between May 31 and Sept. 20, 1982. The three studies were: 1) plant phenology and moose utilization study, 2) pre-burn inventory and assessment of vegetation in Alphabet Hills, and 3) inventory of available browse and its utilization by moose. |
---|---|
Physical Description: | [237] p. : ill., maps ; 28 cm. |
Notes: | At head of title: Alaska Power Authority, Susitna Hydroelectric Project. Series statement from label on cover. Additional authors: Dot Helm, James G. MacCracken, Patrick V. Mayer. "March 1983." |
Bibliography: | Includes bibliographical references (p. [98]-[99]). |