Instream ice simulations, supplementary studies for middle Susitna River /

"River ice simulation results are presented herein as a supplement to those included in the 'Instream Ice Simulation Study' (Harza-Ebasco 1984b)."--Summary.

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project. Instream ice simulations, supplementary studies for middle Susitna River

Supplementary studies for middle Susitna River
Corporate Contributor(s):Alaska Power Authority.

HARZA-EBASCO Susitna Joint Venture.

Susitna Hydroelectric Project.

United States. Federal Energy Regulatory Commission.
Publisher:Alaska Power Authority,
Report Numbers:APA 2845

APA 2947

SUS 533
Edition:[Draft].
Series:Document (Susitna Hydroelectric Project) ; no. 2845.
Document (Susitna Hydroelectric Project) ; no. 2947.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:"River ice simulation results are presented herein as a supplement to those included in the 'Instream Ice Simulation Study' (Harza-Ebasco 1984b)."--Summary.
Physical Description:[5], 20, [685] pages : illustrations, maps ; 28 cm.
Notes:Chiefly charts and tables.

At head of title: Susitna Hydroelectric Project.

"Draft report, July 1985"--Cover.

"Final Report, July 1985."

The title page incorrectly listed this document as the final report.

"Susitna file no. 42.2.5."

"Federal Energy Regulatory Commission, Project No. 7114"--Cover.
Report Type:Draft report.
Bibliography:Includes bibliographical references (page 21).