Technical memorandum, total dissolved gas analysis 1984 /

Date, time, total dissolved gas (mmHg), and water temperature in Celsius were monitored from July 15 to Sept. 21, 1984 at river mile 136 of the Susitna River near Gold Creek.

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project. Technical memorandum, total dissolved gas analysis 1984

Total dissolved gas analysis 1984
Corporate Contributor(s):HARZA-EBASCO Susitna Joint Venture.

Alaska Power Authority.

Susitna Hydroelectric Project.
Publisher:Alaska Power Authority,
Report Numbers:APA 3403
Series:Document (Susitna Hydroelectric Project) ; no. 3403.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:Date, time, total dissolved gas (mmHg), and water temperature in Celsius were monitored from July 15 to Sept. 21, 1984 at river mile 136 of the Susitna River near Gold Creek.
Physical Description:5, [32] leaves. : ill. ; 28 cm.
Notes:Chiefly tables.

At head of title: Susitna Hydroelectric Project.

"March 1986."

"Susitna File No. 4.10.2."

"Federal Energy Regulatory Commission. Project No. 7114"--Cover.
Report Type:Final report.
Bibliography:Includes bibliographical references (leaf 5).