Task 4, Environmental. Susitna River ice study, 1982-1983 /

This study focuses on specific problems of ice cover related to hydroelectric power development on the Susitna River through field observations and measurements. It discusses staging, ice cover development in sloughs, ice jams, and sediment transport.

Saved in:
Bibliographic Details
Alternate Title:Alaska Power Authority, Susitna Hydroelectric Project. Task 4, Environmental. Susitna River ice study, 1982-1983

Susitna River ice study, 1982-1983

Susitna Hydroelectric Project. Susitna River ice study, 1982-1983, Task 4, Environmental

Alaska Power Authority, Susitna Hydroelectric Project. Susitna River ice study, 1982-1983
Main Author: Schoch, G. Carl,
Corporate Contributor(s):Susitna Hydroelectric Project.

R & M Consultants,

HARZA-EBASCO Susitna Joint Venture,

Alaska Power Authority,
Publisher:Alaska Power Authority,
Report Numbers:APA 91

SUS 191
Edition:Preliminary draft.
Series:Document (Susitna Hydroelectric Project) ; no. 91.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 04297cam a2200793Ia 4500
001 1431172
003 SIRSI
005 20160304173634.0
007 ta
007 he bm|b|c||||
007 cr bn||a||||||
008 010131e198308 akuabdf bt s000 0 eng d
040 |a UAF  |b eng  |c UAF  |d OCLCQ  |d OCLCF  |d OCLCO  |d OCLCQ  |d RLA 
035 |a (OCoLC)45826415 
043 |a n-us-ak 
050 4 |a GB1398.4.A4  |b S36 1983 
050 4 |a TK1425.S8  |b A23 no. 91 
088 |a APA 91 
088 |a SUS 191 
100 1 |a Schoch, G. Carl,  |e author. 
245 1 0 |a Task 4, Environmental.  |p Susitna River ice study, 1982-1983 /  |c prepared by G. Carl Schoch (R & M Consultants, Inc.). 
246 3 |a Alaska Power Authority, Susitna Hydroelectric Project.  |n Task 4,  |p Environmental.  |p Susitna River ice study, 1982-1983 
246 3 0 |a Susitna River ice study, 1982-1983 
246 1 4 |a Susitna Hydroelectric Project.  |p Susitna River ice study, 1982-1983, Task 4, Environmental 
246 1 6 |a Alaska Power Authority, Susitna Hydroelectric Project.  |p Susitna River ice study, 1982-1983 
250 |a Preliminary draft. 
260 |a [Alaska] :  |b Alaska Power Authority,  |c [1983] 
300 |a xiii, 184 pages, 22 pages of plates :  |b illustrations, maps, charts ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
500 |a At head of title: Alaska Power Authority, Susitna Hydroelectric Project. 
500 |a Title of appendix B varies in table of contents. 
500 |a "Prepared by R & M Consultants, Inc."--Cover. 
500 |a "Prepared for Harza/Ebasco Susitna Joint Venture." 
500 |a "August 1983." 
510 3 |a Assigned APA Document no. 91 in the Susitna Hydroelectric Project document index. 
510 3 |a Assigned number SUS 191 in the Susitna Aquatic Impact Assessment Project bibliography. 
530 |a Available also in electronic format on the Internet and in microfiche format. 
520 |a This study focuses on specific problems of ice cover related to hydroelectric power development on the Susitna River through field observations and measurements. It discusses staging, ice cover development in sloughs, ice jams, and sediment transport. 
505 2 |a Introduction -- Summary -- Meteorology -- Susitna River freeze-up processes -- Susitna River breakup processes -- Sediment transport -- Environmental effects -- Appendix A. Monthly meteorological summaries from weather stations at Denali, Watana, Devil Canyon, Sherman, and Talkeetna -- Appendix B. Susitna River maps (aerial photo mosaics) from Goose Creek to Devil Canyon. 
504 |a Includes bibliographical references (pages 138-140). 
650 0 |a Ice on rivers, lakes, etc.  |z Alaska  |z Susitna River. 
650 0 |a Ice mechanics. 
650 0 |a Ice on rivers, lakes, etc.  |x Environmental aspects  |z Alaska  |z Susitna River. 
650 0 |a Hydroelectric power plants  |x Environmental aspects  |z Alaska  |z Susitna River. 
650 0 |a Dams  |x Environmental aspects  |z Alaska  |z Susitna River. 
651 0 |a Susitna River (Alaska)  |x Temperature. 
650 0 |a Hydrology  |z Alaska  |z Susitna River. 
651 0 |a Susitna River Valley (Alaska)  |x Climate  |v Observations. 
610 2 0 |a Susitna Hydroelectric Project. 
610 2 7 |a Susitna Hydroelectric Project.  |2 fast  |0 (OCoLC)fst00592845 
650 7 |a Hydroelectric power plants  |x Environmental aspects.  |2 fast  |0 (OCoLC)fst00964942 
650 7 |a Hydrology.  |2 fast  |0 (OCoLC)fst00965147 
650 7 |a Ice mechanics.  |2 fast  |0 (OCoLC)fst00966590 
650 7 |a Ice on rivers, lakes, etc.  |2 fast  |0 (OCoLC)fst00966601 
650 7 |a Ice on rivers, lakes, etc.  |x Environmental aspects.  |2 fast  |0 (OCoLC)fst00966603 
651 7 |a Alaska  |z Susitna River.  |2 fast  |0 (OCoLC)fst01246005 
650 7 |a Temperature.  |2 fast  |0 (OCoLC)fst01147333 
655 7 |a Observations.  |2 fast  |0 (OCoLC)fst01423822 
710 2 |a Susitna Hydroelectric Project. 
710 2 |a R & M Consultants,  |e creator. 
710 2 |a HARZA-EBASCO Susitna Joint Venture,  |e sponsoring body. 
710 2 |a Alaska Power Authority,  |e issuing body. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 91. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/0/APA91.pdf  |z ARLIS Document Server 
596 |a 9 10 
098 |a APA 00091 
098 |a SUS 00191