Task 4, Environmental. Susitna River ice study, 1982-1983 /

This study focuses on specific problems of ice cover related to hydroelectric power development on the Susitna River through field observations and measurements. It discusses staging, ice cover development in sloughs, ice jams, and sediment transport.

Saved in:
Bibliographic Details
Alternate Title:Alaska Power Authority, Susitna Hydroelectric Project. Task 4, Environmental. Susitna River ice study, 1982-1983

Susitna River ice study, 1982-1983

Susitna Hydroelectric Project. Susitna River ice study, 1982-1983, Task 4, Environmental

Alaska Power Authority, Susitna Hydroelectric Project. Susitna River ice study, 1982-1983
Main Author: Schoch, G. Carl,
Corporate Contributor(s):Susitna Hydroelectric Project.

R & M Consultants,

HARZA-EBASCO Susitna Joint Venture,

Alaska Power Authority,
Publisher:Alaska Power Authority,
Report Numbers:APA 91

SUS 191
Edition:Preliminary draft.
Series:Document (Susitna Hydroelectric Project) ; no. 91.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:This study focuses on specific problems of ice cover related to hydroelectric power development on the Susitna River through field observations and measurements. It discusses staging, ice cover development in sloughs, ice jams, and sediment transport.
Physical Description:xiii, 184 pages, 22 pages of plates : illustrations, maps, charts ; 28 cm.
Notes:At head of title: Alaska Power Authority, Susitna Hydroelectric Project.

Title of appendix B varies in table of contents.

"Prepared by R & M Consultants, Inc."--Cover.

"Prepared for Harza/Ebasco Susitna Joint Venture."

"August 1983."
Bibliography:Includes bibliographical references (pages 138-140).