Task 3, Hydrology. Processed climatic data. Volume 6, Devil Canyon Station /

The Devil Canyon Climate Station was installed on July 17, 1980, on a ridge on the South bank of the Susitna River one half mile downstream of the Devil Canyon damsite. The data were collected using a Digital Weather Station manufactured by Meteorology Research Incorporated (MRI). Climatic data in t...

Full description

Saved in:
Bibliographic Details
Alternate Title:Handwritten title on R & M Consultants binder: Susitna Hydroelectric Project. Processed climatic data. Volume 6, Devil Canyon Station

Processed climatic data. Volume 6, Devil Canyon Station, July 17, 1980 thru September 30, 1981

Alaska Power Authority, Susitna Hydroelectric Project. Task 3, Hydrology. Processed climatic data. Volume 6, Devil Canyon Station

Processed climatic data. Volume 6, Devil Canyon Station
Corporate Contributor(s):R & M Consultants,

Acres American Incorporated.

Alaska Power Authority.

Susitna Hydroelectric Project.

HARZA-EBASCO Susitna Joint Venture.
Publisher:R & M Consultants, Inc.,

Alaska Power Authority
Report Numbers:APA 208

APA 1238

SUS 171
Series:Document (Susitna Hydroelectric Project) ; no. 208.
Document (Susitna Hydroelectric Project) ; no. 1238.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Description
Summary:The Devil Canyon Climate Station was installed on July 17, 1980, on a ridge on the South bank of the Susitna River one half mile downstream of the Devil Canyon damsite. The data were collected using a Digital Weather Station manufactured by Meteorology Research Incorporated (MRI). Climatic data in this report cover July 17, 1980 through September 30, 1981 excluding a one-month period between 1:00 pm on August 12, 1981 and 11:00 am on September 14, 1981.
Physical Description:1 volume : illustrations ; 28 cm.
Notes:At head of title: Alaska Power Authority, Susitna Hydroelectric Project.

At head of cover title: Susitna Hydroelectric Project.

"Prepared for Acres American Incorporated."

Chiefly tables.

"March 1982."

All copies were distributed with one set of data for the entire month of July 1981 (9 pages). Some copies were distributed with an additional set of preliminary data for July 1981 (also 9 pages) that cover only the first two and half days of July.

The copies without the additional set of preliminary data for July 1981 contain 142 pages. The copies with the July 1981 preliminary data contain 151 pages (known to be issued at least in some copies published by Alaska Power Authority).

Series statement from label on cover.