Slough hydrogeology report

"The objective of this study task is to understand slough hydrology under existing, natural conditions and thus provide a methodology by which post-project conditions can be predicted. The study is comprised of four stages: data collection, data interpretation, modeling of existing conditions t...

Full description

Saved in:
Bibliographic Details
Alternate Title:Title on fiche header: Slough hydrology report

Susitna Hydroelectric Project. Slough hydrogeology studies report

Susitna Hydroelectric Project. Slough hydrogeology report

Draft Susitna Hydroelectric Project slough hydrogeology report
Corporate Contributor(s):Acres American Incorporated.

Susitna Hydroelectric Project.
Publisher:[Acres American],
Report Numbers:APA 519

SUS 165
Series:Document (Susitna Hydroelectric Project) ; no. 519.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:"The objective of this study task is to understand slough hydrology under existing, natural conditions and thus provide a methodology by which post-project conditions can be predicted. The study is comprised of four stages: data collection, data interpretation, modeling of existing conditions to understand processes, [and] prediction of post-project conditions."--P. 1.
Physical Description:[2], ii, 27, [18] p. : ill. ; 28 cm.
Notes:At head of title: Draft, Susitna Hydroelectric Project.

Publisher from microfiche header.

"March 1983."
Report Type:Draft.
Bibliography:Includes bibliographical references (p. 27).