Anchorage-Fairbanks transmission intertie economic feasibility study report /

"This report presents a determination of the economic feasibility for a transmission line interconnection between the utility systems of the Anchorage and Fairbanks areas. It includes an objective evaluation of the specific conditions under which the intertie is economically feasible. ... This...

Full description

Saved in:
Bibliographic Details
Alternate Title:Alaska Power Authority. Anchorage-Fairbanks transmission intertie economic feasibility study report

Economic feasibility study report
Corporate Contributor(s):International Engineering Company.

Robert W. Retherford Associates.

Alaska Power Authority.
Publisher:Alaska Power Authority,
Report Numbers:APA 146 (draft)

APA 3205 (draft)
Funding Numbers:"Performed under ... contract between the Alaska Power Authority and the joint-venture of International Engineering Company, Inc. (IECO) and Robert W. Retherford Associates (RWRA)"--Page 1-1
Edition:[Draft].
Series:Document (Susitna Hydroelectric Project) ; no. 146d.
Document (Susitna Hydroelectric Project) ; no. 3205d.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Contents:
  • Introduction
  • Summary and conclusions
  • Load forecasts for Railbelt area
  • Selection of intertie route
  • Transmission line design
  • System expansion plans
  • Facility cost estimates
  • Economic feasibility anaysis
  • Financial planning concepts
  • Institutional considerations
  • appendix A. Notes on future use of energy in Alaska
  • appendix B. Transmission Line Costs Analysis Program (TLCAP)
  • appendix C. Multi-Area Reliability Program (MAREL)
  • appendix D. Data and cost estimates for transmission intertie and generating plants
  • appendix E. Transmission Line Economic Analysis Program
  • appendix F. Transmission line financial analysis.