Anchorage-Fairbanks transmission intertie economic feasibility study report /

"This report presents a determination of the economic feasibility for a transmission line interconnection between the utility systems of the Anchorage and Fairbanks areas. It includes an objective evaluation of the specific conditions under which the intertie is economically feasible. ... This...

Full description

Saved in:
Bibliographic Details
Alternate Title:Alaska Power Authority. Anchorage-Fairbanks transmission intertie economic feasibility study report

Economic feasibility study report
Corporate Contributor(s):International Engineering Company.

Robert W. Retherford Associates.

Alaska Power Authority.
Publisher:Alaska Power Authority,
Report Numbers:APA 146 (draft)

APA 3205 (draft)
Funding Numbers:"Performed under ... contract between the Alaska Power Authority and the joint-venture of International Engineering Company, Inc. (IECO) and Robert W. Retherford Associates (RWRA)"--Page 1-1
Edition:[Draft].
Series:Document (Susitna Hydroelectric Project) ; no. 146d.
Document (Susitna Hydroelectric Project) ; no. 3205d.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 04913cam a2200709Ia 4500
001 1092899
003 SIRSI
005 20160414150105.0
007 ta
007 cr cn||a||||||
008 800423e197904 akuabf bst s000 0 eng d
040 |a UDA  |b eng  |c UDA  |d OCL  |d OCLCQ  |d RLA  |d OCLCQ  |d RLA  |d OCLCF  |d OCLCQ  |d RLA 
035 |a (OCoLC)6234354 
043 |a n-us-ak 
050 4 |a HD9685.U63  |b A475 1979d 
050 4 |a TK1425.S8  |b A23 no. 146d 
088 |a APA 146 (draft) 
088 |a APA 3205 (draft) 
245 0 0 |a Anchorage-Fairbanks transmission intertie economic feasibility study report /  |c International Engineering Company, Inc., Robert W. Retherford Associates. 
246 3 |a Alaska Power Authority.  |p Anchorage-Fairbanks transmission intertie economic feasibility study report 
246 3 0 |a Economic feasibility study report 
250 |a [Draft]. 
260 |a [Juneau, Alaska] :  |b Alaska Power Authority,  |c [1979] 
300 |a 350 leaves in various foliations, 3 folded leaves of plates :  |b illustrations, maps ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
500 |a At head of title: Alaska Power Authority. 
500 |a Stamped on title page and cover: "Draft." 
500 |a "April 1979." 
536 |a "Performed under ... contract between the Alaska Power Authority and the joint-venture of International Engineering Company, Inc. (IECO) and Robert W. Retherford Associates (RWRA)"--Page 1-1 
510 3 |a The final version of this report is assigned APA Document no. 146 in the Susitna Hydroelectric Project document index, and was also assigned no. 3205 (duplicate entry). Alaska Resources Library and Information Services has assigned "APA 146 (draft)" (or "APA 146d") and "APA 3205 (draft)" (or APA 3205d) to this draft version for the Susitna Hydroelectric Project collection. 
530 |a Available also in electronic format on the Internet. 
520 |a "This report presents a determination of the economic feasibility for a transmission line interconnection between the utility systems of the Anchorage and Fairbanks areas. It includes an objective evaluation of the specific conditions under which the intertie is economically feasible. ... This study confirms the economic feasibility of the Anchorage-Fairbanks transmission line interconnection as well as the possibility of an early implementation date for the project, prior to longer-range development of the Upper Susitna Hydropower Project."--Pages 1-1 and 1-2. 
505 0 |a Introduction -- Summary and conclusions -- Load forecasts for Railbelt area -- Selection of intertie route -- Transmission line design -- System expansion plans -- Facility cost estimates -- Economic feasibility anaysis -- Financial planning concepts -- Institutional considerations -- appendix A. Notes on future use of energy in Alaska -- appendix B. Transmission Line Costs Analysis Program (TLCAP) -- appendix C. Multi-Area Reliability Program (MAREL) -- appendix D. Data and cost estimates for transmission intertie and generating plants -- appendix E. Transmission Line Economic Analysis Program -- appendix F. Transmission line financial analysis. 
504 |a Includes bibliographical references. 
650 0 |a Interconnected electric utility systems  |x Economic aspects  |z Alaska. 
650 0 |a Electric power transmission  |x Economic aspects  |z Alaska. 
650 0 |a Electric utilities  |z Alaska. 
650 0 |a Electric power production  |z Alaska  |x Costs  |v Statistics. 
650 0 |a Electric power consumption  |z Alaska  |x Forecasting. 
610 2 0 |a Susitna Hydroelectric Project  |x Planning. 
650 0 |a Hydroelectric power plants  |z Alaska  |z Susitna River  |x Planning. 
610 2 7 |a Susitna Hydroelectric Project.  |2 fast  |0 (OCoLC)fst00592845 
650 7 |a Electric power consumption  |x Forecasting.  |2 fast  |0 (OCoLC)fst00905405 
650 7 |a Electric power production  |x Costs.  |2 fast  |0 (OCoLC)fst00905479 
650 7 |a Electric power transmission  |x Economic aspects.  |2 fast  |0 (OCoLC)fst00905606 
650 7 |a Electric utilities.  |2 fast  |0 (OCoLC)fst00905974 
650 7 |a Hydroelectric power plants.  |2 fast  |0 (OCoLC)fst00964930 
650 7 |a Interconnected electric utility systems  |x Economic aspects.  |2 fast  |0 (OCoLC)fst00976040 
651 7 |a Alaska.  |2 fast  |0 (OCoLC)fst01204480 
651 7 |a Alaska  |z Susitna River.  |2 fast  |0 (OCoLC)fst01246005 
655 7 |a Statistics.  |2 fast  |0 (OCoLC)fst01423727 
710 2 |a International Engineering Company. 
710 2 |a Robert W. Retherford Associates. 
710 2 |a Alaska Power Authority. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 146d.  |5 AkARLIS 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 3205d.  |5 AkARLIS 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/1/APA146d.pdf  |z ARLIS Document Server 
596 |a 9 10 
098 |a APA 00146 (draft) 