Energy simulation studies to select project drawdown and mitigation flows

"Provide[s] the details behind the recommended project operation, drawdown and downstream mitigation flow. ... The incentive to redefine the costs associated with providing downstream minimum flows and greater drawdowns is a result of discussions stemming from review of the Feasibility Report a...

Full description

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project. Energy simulation studies to select project drawdown and mitigation flows

Susitna Hydroelectric Project. Energy simulation studies conducted to select project drawdown and mitigation flow case
Corporate Contributor(s):Susitna Hydroelectric Project.

Acres American Incorporated.
Publisher:Acres American Inc.,
Report Numbers:APA 489

SUS 215
Series:Document (Susitna Hydroelectric Project) ; no. 489.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:"Provide[s] the details behind the recommended project operation, drawdown and downstream mitigation flow. ... The incentive to redefine the costs associated with providing downstream minimum flows and greater drawdowns is a result of discussions stemming from review of the Feasibility Report and internal critiques of analyses conducted to date."--P. [2].
Physical Description:127 p. in various pagings : ill., map ; 28 cm.
Notes:At head of title: Susitna Hydroelectric Project.

"October 4, 1982"--P. [2].