Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000;
Initial Filing of September 2014 Technical Memoranda


Alaska Energy Authority
Susitna-Watana Hydroelectric Project

Published: Anchorage : Alaska Energy Authority, 2014.

September 2014.

Assigned SuWa numbers 228 to 238.

These reports (cover letter with 11 attachments) were prepared for Alaska Energy Authority for the Susitna-Watana Hydroelectric Project


 

LINKS VIA ARLIS DOCUMENT SERVER:

SuWa NumberVolumeStudy Plan NumberStudy Title
228Cover letter-- Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000; Initial filing of September 2014 technical memoranda

Title from subject line.

September 17, 2014

229Attachment A-- Proposal to eliminate the Chulitna Corridor from further study
230Attachment B7.6 Ice processes in the Susitna River study (Study 7.6) : detailed ice observations, October 2013 - May 2014, technical memorandum
  • [Main report]
  • Appendix A.   Meteorological data for the Susitna basin
  • Appendix B.   Susitna River surface water station data

231Attachment C9.5 Study of fish distribution and abundance in the upper Susitna River (Study 9.5) : proposed 2015 modifications to fish distribution and abundance study plan implementation, technical memorandum
232Attachment D9.6 Study of fish distribution and abundance in the middle and lower Susitna River (Study 9.6) : 2013-2014 winter fish study, technical memorandum
233Attachment E9.9 Characterization and mapping of aquatic habitats (Study 9.9) : 2013 and 2014 aquatic habitat mapping field season completion progress, technical memorandum
234Attachment F9.16 Eulachon run timing, distribution, and spawning in the Susitna River (Study 9.16) : 2015 proposed eulachon spawning habitat study modifications, technical memorandum
235Attachment G8.5 Fish and aquatics instream flow study (Study 8.5) : evaluation of relationships between fish abundance and specific microhabitat variables, technical memorandum
236Attachment H8.5 Fish and aquatics instream flow study (Study 8.5) : 2013-2014 instream flow winter studies, technical memorandum

Pages 38-40 were replaced by corrected pages issued in SuWa 272.   Those replacement pages are dated December 2014, but are numbered 2-4 as they are in SuWa 272.

237Attachment I6.5 Geomorphology study (Study 6.5) : Susitna River historical cross section comparison (1980s to current), technical memorandum
  • [Main report]
  • Appendix A.   Historical cross section comparison plots

238Attachment J6.5 Geomorphology study (Study 6.5) : 2014 update of sediment-transport relationships and a revised sediment balance for the middle and lower Susitna River segments, technical memorandum
  • [Main report]
  • Appendix A.   Sediment-transport data and regression summary
  • Appendix B.   Annual sediment load tabular summary for pre-Project conditions
  • Appendix C.   Sediment transport rating curves data