December 2012.
| SuWa Number | Section |
| 76 |
Cover letter
To Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, from Wayne Dyok, Project Manager, Alaska Energy Authority |
| Sections 1-5: Intro through water quality Introduction to RSP -- Proposed 2013 and 2014 ILP studies -- Studies not proposed -- Geology and soils -- Water quality |
| Section 6: Geomorphology |
| Sections 7-8: Hydrology through instream flow studies Hydrology-related resources -- Instream flow study: fish, aquatics, and riparian |
| Section 9: Fish and aquatic resources |
| Section 10: Wildlife resources |
| Sections 11-12: Botanical through recreation |
| Sections 13-16: Cultural, subsistence, socioeconomic, project safety Cultural and paleontological resources -- Subsistence resources -- Socioeconomics and transportation resources -- Project safety |
| 77 |
Appendix 1, Comment response table of FERC-filed comments |
| 78 |
Appendix 2, FERC-filed letters coded with comment identifiers |
| 79 |
Appendix 3, Comment response table of informal consultation, July-November 2012 |
| 80 |
Appendix 4, Consultation documentation for informal consultation, July-November 2012 |
| 81 |
Appendix 5, Mapping references |