Final environmental assessment record, Susitna hydropower feasibility study.

Anchorage : U.S. Dept. of the Interior, Bureau of Land Management, [1979]

172 p. in various pagings ; 28 cm. + 7 map plates (34 x 49 cm or 31 x 44 cm.)

"Applicant: Alaska Power Authority."


 

LINKS VIA ARLIS DOCUMENT SERVER:

APA NumberPiece ContentsSize
2956 Text Project description -- Existing environmental setting -- Probable environmental impacts -- Recommended mitigating measures -- Residual impacts -- Relationship between short-term use and long-term productivity -- Irreversible and irretrievable commitments of resources -- Consultation and coordination -- Participating staff -- appendix A. Scenic quality inventory -- appendix B. Tabulation of field activities according to season and year of accomplishment -- appendix C. References.4.9 MB
All maps except 4 (which has a varied title) are called:
Southcentral Railbelt area, Alaska : upper Susitna River basin
Figure 1General location map.1.6 MB
Figure 2Watana Project area.5.2 MB
Figure 3Devil Canyon, project area.2.8 MB
Figure 4Climatology, hydrology & transmission corridors. 3.9 MB
Figure 5Proposed access route study corridor : Denali Highway to Watana damsite and approximate winter trail route.3.8 MB
Figure 6Proposed access route study corridor : Chulitna to Devil Canyon damsite to Watana damsite. 4 MB
Figure 7Land status2.5 MB