Tanana Basin area plan. Phase I, resource inventory / State of Alaska, Department of Natural Resources.

Fairbanks, Alaska : State of Alaska, Department of Natural Resources ; [Washington D.C.] : U.S. Department of Agriculture, Soil Conservation Service, [1983]

7 v. : ill., maps ; 28 cm.


Notes on title information: Five of the seven volumes include the date "August, 1983" or "October, 1983" in the title statement.   The "Fish and wildlife element" volume lacks the statement "Phase I, resource inventory" in the title.



LINKS VIA ARLIS DOCUMENT SERVER:



APA Number *Volume **DateContentNotes
1676 [v. 3] August, 1983 Mineral element
1677 [v. 2] August, 1983 Agriculture element
1678 [v. 1] August, 1983 Forestry element
1679 [v. 7] (see note) Settlement element No date on the cover or chapter title pages.
1680[v. 4]October, 1983 Recreation element
1681[v. 6]October 19, 1983
and
November 10, 1983
(see note)
Fish and wildlife elementChapters 3, 4, 6, 7, 8 and 9 are dated October 19, 1983 and chapter 5 is dated November 10, 1983. Chapters 1 and 2 are not dated.

This Fish and wildlife element report was co-published by State of Alaska, Department of Fish and Game.

This Fish and wildlife element report lacks the "Phase I, resource inventory" statement on the item.

1681 (suppl.)[v. 5]August, 1983 Water resources element This volume published only by State of Alaska, Department of Natural Resources.

This volume was not assigned an APA Document number in the Susitna Hydroelectric Project Document Index. The number "APA 1681 (suppl.)" was assigned by ARLIS.


*     The APA numbers were assigned in the Susitna Hydroelectric Project document index.   This set was used as supporting documentation in research by the Susitna Hydroelectric Project. The APA number for the "Water resources element" report was assigned by ARLIS.

**   Susitna Hydroelectric Project assigned APA Document numbers do not match order of volume numbering.   Volume numbering was assigned by the Library of Congress in the catalog record, and appears arbitrary.



Related Tanana Basin area plan documents
(some used as supporting documentation for research by the Susitna Hydroelectric Project)

Tanana basin area plan. Phase II, development of alternatives.   1983.   (APA 1673 and APA 1674)


Tanana Basin area plan. Summary of the public review draft.   1984.   (APA 1675)


Tanana Basin area plan. Public review draft.   1984.   (APA 2024)


Tanana Basin area plan. Agency review draft.   1984.   Not used as supporting documentation. Not yet available online.


Tanana Basin area plan. Agency review draft.   1990.   Not used as supporting documentation. Not yet available online.