Central Yukon Proposed Resource Management Plan and Final Environmental Impact Statement.
Authoring agencies: Prepared by: U.S. Department of the Interior, Bureau of Land Management.
In cooperation with: U.S. Fish and Wildlife Service, Allakaket Tribal Council, Ruby Tribal Council, Koyukuk Tribal Council, Tanana Tribal Council, Nulato Tribal Council, Venetie Tribal Council, State of Alaska.
Publication: Anchorage, Alaska : United States Department of the Interior, Bureau of Land Management, Alaska State Office, [2024]
"April 2024."
Physical description of original: 3 volumes (1422 pages in various pagings) : 27 color illustrations, 138 color maps ; 28 cm.
Report numbers: DOI-BLM-AK-F030-2013-0062-RMP-EIS -- BLM/AK/PL-21/002+1610+F03
Summary: The purpose of this Resource Management Plan (RMP) is to develop decisions that guide future land management actions and to provide a frameword for site-specific projects and implementation-level decisions in the planning area. The need for the Central Yukon RMP plan grew to address changes in resources, policies, and regulations in the planning area since the existing plans were developed in the 1980s and 1990s. BLM evaluated six alternatives representing current land use plans (including one no action alternative). In this document, BLM is proposing Alternative E. Roughly speaking, the planning area includes lands of the central North Slope Borough lying between the National Petroleum Reserve and the Arctic National Wildlife Refuge, most of the Trans-Alaska Pipeline corridor from the Beaufort Sea to an area just south of Delta Junction, and a wide area that lies between the Brooks Range and Alaska Range from as far west as Kaltag eastward to the Dalton and Richardson highways. Although the planning area covers 56 million acres managed by various landowners and administrators, the decisions of this RMP will apply only to the 13.1 million acres managed by BLM.
Additional documentation: You can also consult BLM's ePlanning website for the Central Yukon Proposed RMP/Final EIS, which includes links to this this document (also linked below) and to many related documentation, such as the 1986 Central Yukon RMP Record of Decision, the Utility Corridor RMP and Final EIS along with the Record of Decision, scoping report and scoping materials, background reports on areas of critical environmental concern and outreach, preparation plan, analysis of the management situation, Gravel Summit meeting documents, community meeting summaries, various inventory reports, preliminary alternatives concepts notice of intent, the Draft RMP/EIS (and its meeting transcripts and public comments), and notices of document availability.
You can also consult the following related websites for related documents and more information about the Ambler Road project:
VOLUME | SECTION | SIZE |
Volume 1 | Executive Summary ; Chapters 1-3 ; References ; Glossary
| 11.1 MB |
Volume 2 | Appendices A-K
| 85 MB |
Volume 3 | Appendices N-S
| 26.4 MB |