Willow Master Development Plan, Final Supplemental Environmental Impact Statement.


Also called:

Caption title on abstract and table of contents pages:   Final Environmental Impact Statement, Willow Master Development Plan Project

Cover title:   Willow Master Development Plan, Supplemental Environmental Impact Statement, Final

Caption title on abstract page (page I):   Final Supplemental Environmental Impact Statement--Willow Master Development Plan

Authors:   Prepared by U.S. Department of the Interior, Bureau of Land Management, Anchorage, Alaska ; in cooperation with: U.S. Army Corps of Engineers, U.S. Environmental Protection Agency, U.S. Fish and Wildlife Service, Native Village of Nuiqsut, Inupiat Community of the Arctic Slope, City of Nuiqsut, North Slope Borough, State of Alaska.

Publication:   [Anchorage, Alaska] : U.S. Department of the Interior, Bureau of Land Management, [Alaska State Office], [2023]

January 2023.

Physical description of original:   11 volumes : color illustrations, color maps (some fold out) ; 28 cm.
The electronic version is organized in over 20 PDF files and enumerated as 16 volumes as described in the table below.   Thus, the contents of the print volumes do not coincide with the contents of the electronic volumes bearing the same numbering.

Technical report numbers:   DOI-BLM-AK-0000-2018-0004-EIS   ;   BLM/AK/PL-22/032+1610+F010

Related Websites and Documents:




PRINTED
VOLUME
ELECTRONIC
VOLUME
SECTIONSIZE
Volume 1Volume 1Chapters 1 through 5, Glossary, and References
  • Executive Summary
  • 1.   Introduction and Purpose and Need
  • 2.   Alternatives
  • 3.   Affected Environment and Environmental Consequences
  • 4.   Spill Risk Assessment
  • 5.   Mitigation
  • Glossary Terms
  • References
  • Index
  • List of Preparers
20 MB
Volume 2Volume 2 Appendix A.1.   Figures 1.4.1 - 2.7.1B26 MB
Volume 3Appendix A.2.   Figures 3.3.1 - 3.8.776 MB
Volume 4Appendix A.3.   Figures 3.9.1 - 3.11.7B86.5 MB
Volume 5Appendix A.4.   Figures 3.12.1 - 3.14.252.6 MB
Volume 6Appendix A.5.   Figures 3.16.1 - 3.16.5143 MB
Volume 7Appendix A.6.   Figures 3.19.1 - 4.3.5B15.7 MB
Volume 3 and 4 (in part)Volume 8Appendices B-C
  • Appendix B.   Public Engagement and Comment Response
  • Appendix C.   Regulatory Authorities and Framework
9.3 MB
Volume 4Volume 9Appendix D.1.   Alternatives Development89 MB
Volume 10
(part 1)
Appendices D.2 to D.3

Actually includes only:

  • Appendix D.2.   Willow Mine Site Mining and Reclamation Plan
6 MB
Volume 5Volume 10
(part 2)
Appendix D.3A.   Ice Bridge Plan
  • 2019-2020 Willow Development Ocean Point Ice Bridge Revision
  • Includes:

    • Appendix C.   2019-2020 Summary Report: Willow Ice Road--Ocean Point Water Resources Field Investigation
    • Includes:

      • Attachment B.   2019 Willow Ice Road Fall Field Trip Report

    • Appendix D.   Ocean Point Weather Station System Description, 14 April 2020
12.2 MB
Volume 10
(part 3)
Appendix D.3B.   Ice Bridge Plan
  • 2021 Willow Development Ocean Point Ice Bridge Crossing Update
  • Includes:

    • Appendix C.   2021 Summary Report: Ocean Point Discharge and Water Quality
4 MB
Volume 10
(part 4)
Appendix D.3C   Ice Bridge Plan
  • 2022 Summary Report: Ocean Point Discharge and Water Quality
4 MB
Volume 11
(part 1)
Appendices E.1 to E.3A
  • Appendix E.1.   Inupiaq and Scientific Names
  • Appendix E.2.   Climate and Climate Change Technical Appendix
    • Appendix E.2A.   Climate and Climate Change Technical Appendix
    • Appendix E.2B.   Bureau of Land Management Energy Substitution Model (EnergySub)
  • Appendix E.3.   Air Quality Technical Information
    • Appendix E.3A.   Air Quality Technical Appendix

      Called "Air Quality Technical Information" on the title page for this appendix.

8.2 MB
Volume 6Volume 11
(part 2)
    • Appendix E.3B.1.   Air Quality Technical Appendix : Air Quality Technical Support Document
7.8 MB
Volumes 7, 8, and 9 (in part)Volume 11
(part 3)
    • Appendix E.3B.2.   Air Quality Technical Appendix : Air Quality Technical Support Document.   Attachments A-I
37.4 MB
Volume 9Volume 11
(part 4)
  • Appendix E.3C.   Non-GHG Air Quality and Public Health Analysis of Downstream Combustion of Willow Oil
5.7 MB
Volume 11
(part 5)
Appendices E.4 to E.7
  • Appendix E.4.   Soils, Permafrost, and Gravel Resources Technical Appendix   ("There is no technical appendix for this resource.")
  • Appendix E.5.   Contaminated Sites Technical Appendix
  • Appendix E.6.   Noise Technical Appendix   ("There is no technical appendix for this resource.")
  • Appendix E.7.   Visual Resources Technical Appendix
    • Appendix E.7A.   Visual Resources Technical Appendix
    • Appendix E.7B.   Visual Contrast Ratings Worksheets
5.5 MB
Volume 12Appendix E.8
  • Appendix E.8A.   Water Resources Technical Appendix
  • Appendix E.8B.   Ocean Point Technical Memorandums (May 26, 2020 and January 31, 2022)
3 MB
Volume 13Appendix E.9 to 13
  • Appendix E.9.     Vegetation and Wetlands Technical Appendix
  • Appendix E.10.   Fish Technical Appendix
  • Appendix E.11.   Birds Technical Appendix
  • Appendix E.12.   Terrestrial Mammals Technical Appendix
  • Appendix E.13.   Marine Mammals Technical Appendix
13 MB
Volume 10Volume 14Appendix E.14.   Land Ownership and Use Technical Appendix : North Slope Borough Ordinance Serial No. 75-06-7527 MB
Volume 15Appendix E.15 to H
  • Appendix E.15.   Economics Technical Appendix
  • Appendix E.16.   Subsistence and Sociocultural Systems Technical Appendix
  • Appendix E.17.   Environmental Justice Technical Appendix   ("There is no technical appendix for this resource.")
  • Appendix E.18.   Public Health Technical Appendix
  • Appendix E.19.   Wilderness Characteristics Technical Appendix   ("There is no technical appendix for this resource.")
  • Appendix E.20.   Cumulative Effects Technical Appendix   ("There is no technical appendix for this resource.")
  • Appendix F.   Cultural Resources Findings: Process and Analysis
  • Appendix G.   Alaska National Interest Lands Conservation Act Section 810 Analysis
  • Appendix H.   Spill Summary, Prevention, and Response Planning
68 MB
Volume 16
(part 1)
Appendix I.   Avoidance, Minimization, and Mitigation Technical Appendix
  • Appendix I.1.   Avoidance, Minimization, and Mitigation
  • Appendix I.2.   ConocoPhillips Road Optimization Memorandum
  • Appendix I.3.   Dust Control Plan
3.7 MB
Volume 11Volume 16
(part 2)
  • Appendix I.4.   Willow Master Development Plan (Willow Project) POA-2018-00190 Harrison Bay, Permittee-Responsible Wetlands Compensatory Mitigtion Plan, North Slope, Alaska.
    • Main text
    • Appendix A1.   Figures
56.3 MB
Volume 16
(part 3)
    • Appendix A2.   Plan Views and Cross Sections
    • Appendix B.   Willow Project Impacts within 500 Feet of Anadromous Fish-Bearing Waters
    • Appendix C.   Willow Project Impacts within Colville River Special Area
    • Appendix D.   Willow Project Impacts within the Teshekpuk Lake Special Area
13.4 MB
Volume 16
(part 4)
    • Appendix E.   Aquatic Site Assessment and Credit-Debit Calculation
22 MB
Volume 16
(part 5)
    • Appendix F.   Anaktuvuk Pass Subsistence Trail Tundra Rehabilitation Aquatic Site Assessment and Credit-Debit Calculation
    • Appendix G.   Wetlands Enhancement Mitigation Monitoring Plan: Nuiqsut and Anaktuvuk Pass Trail Tundra Rehabilitation
    • Appendix H.   Wetlands Preservation Mitigation Monitoring Plan: Cape Halkett or Fish Creek
28.3 MB
Volume 16
(part 6)
Appendix J.   National Petroleum Reserve in Alaska Integrated Activity Plan Environmental Impact Statement Traditional Knowledge Compilation1.4 MB