Willow Master Development Plan Supplemental Environmental Impact Statement, Draft.


Also called:

Title on title page of volume 1:   Willow Master Development Plan Final Supplemental Environmental Impact Statement   (Note: This title is misleading.   It ought to read how it appears on the cover.)

Cover title:   Willow Master Development Plan Supplemental Environmental Impact Statement, Draft

Caption title on abstract page (page I):   Draft Supplemental Environmental Impact Statement--Willow Master Development Plan

Authors:   Prepared by U.S. Department of the Interior, Bureau of Land Management, Anchorage, Alaska ; in cooperation with: U.S. Army Corps of Engineers, U.S. Environmental Protection Agency, U.S. Fish and Wildlife Service, Native Village of Nuiqsut, Inupiat Community of the Arctic Slope, City of Nuiqsut, North Slope Borough, State of Alaska.

Publication:   [Anchorage, Alaska] : U.S. Department of the Interior, Bureau of Land Management, [Alaska State Office], [2022]

June 2022.

Physical description of original:   6 volumes : color illustrations, color maps, plans (some color) ; 28 cm.
The electronic version is organized as 8 PDF files and enumerated 1 to 8 as described in the table below.   Thus, the contents of the print volumes do not coincide with the contents of the electronic volumes that bear the same numbering.

Standard technical report numbers:   DOI-BLM-AK-0000-2018-0004-EIS   ;   BLM/AK/PL-22/032+1610+F010

Related Websites:




PRINTED
VOLUME
ELECTRONIC
VOLUME
SECTIONSIZE
Volume 1Volume 1Executive Summary, Chapters 1 through 5, Glossary, and References
  • Executive Summary
  • 1.   Introduction and Purpose and Need
  • 2.   Alternatives
  • 3.   Affected Environment and Environmental Consequences
  • 4.   Spill Risk Assessment
  • 5.   Mitigation
  • Glossary Terms
  • References
  • Index
  • List of Preparers
9.4 MB
Volume 2Volume 2 Appendix A, Part 1.   Figure 1.4.1 through 3.12.739.6 MB
Volume 3Appendix A, Part 2.   Figure 3.13.1 through figure 4.3.5B28.8 MB
Volume 3Volume 4Appendix B through Appendix C
  • Appendix B.   Public Engagement and Comment Response
  • Appendix C.   Regulatory Authorities and Framework
6.5 MB
Volume 4Volume 5Appendix D.   Alternatives Development
  • Appendix D.1.   Alternatives Development
  • Appendix D.2.   Willow Mine Site Mining and Reclamation Plan
  • Includes:

    • Appendix B.   Revegetation Plan for the Proposed Willow Gravel Mine Site, National Petroleum Reserve-Alaska

  • Appendix D.3.   Ice Bridge Plan : 2019-2020 Willow Development Ocean Point Ice Bridge Revision
  • Includes:

    • Appendix C.   2019-2020 Summary Report: Willow Ice Road--Ocean Point Water Resources Field Investigation
    • Includes:

      • Attachment B.   2019 Willow Ice Road Fall Field Trip Report

    • Appendix D.   Ocean Point Weather Station System Description, 14 April 2020
41.4 MB
Volume 5Volume 6Appendices E.1 through E.15
  • Appendix E.1.   Inupiaq and Scientific Names
  • Appendix E.2.   Climate and Climate Change Technical Appendix
    • Appendix E.2A.   Climate and Climate Change Technical Appendix
    • Appendix E.2B.   Bureau of Land Management Energy Substitution Model (EnergySub)
  • Appendix E.3.   Air Quality Technical Information
    • Appendix E.3A.   Air Quality Technical Appendix

      Called "Air Quality Technical Information" on the title page for this appendix.

    • Appendix E.3B.   Air Quality Technical Support Document
  • Appendix E.4.   Soils, Permafrost, and Gravel Resources Technical Appendix   ("There is no technical appendix for this resource.")
  • Appendix E.5.   Contaminated Sites Technical Appendix
  • Appendix E.6.   Noise Technical Appendix   ("There is no technical appendix for this resource.")
  • Appendix E.7.   Visual Resources Technical Appendix
    • Appendix E.7A.   Visual Resources Technical Appendix
    • Appendix E.7B.   Visual Contrast Ratings Worksheets
  • Appendix E.8
    • Appendix E.8A.   Water Resources Technical Appendix
    • Appendix E.8B.   Ocean Point Technical Memorandums (May 26, 2020 and January 31, 2022)
  • Appendix E.9.     Vegetation and Wetlands Technical Appendix
  • Appendix E.10.   Fish Technical Appendix
  • Appendix E.11.   Birds Technical Appendix
  • Appendix E.12.   Terrestrial Mammals Technical Appendix
  • Appendix E.13.   Marine Mammals Technical Appendix
  • Appendix E.14.   Land Ownership and Use Technical Appendix : North Slope Borough Ordinance Serial No. 75-06-75   (Not included)
  • Appendix E.15.   Economics Technical Appendix
32.2 MB
Volume 5Volume 7Appendices E.16 through E.19
  • Appendix E.16.   Subsistence and Sociocultural Systems Technical Appendix
  • Appendix E.17.   Environmental Justice Technical Appendix   ("There is no technical appendix for this resource.")
  • Appendix E.18.   Public Health Technical Appendix
  • Appendix E.19.   Cumulative Effects Technical Appendix   ("There is no technical appendix for this resource.")
33.2 MB
Volume 6Volume 8Appendix F through Appendix J
  • Appendix F.   Cultural Resources Findings: Process and Analysis
  • Appendix G.   Alaska National Interest Lands Conservation Act Section 810 Analysis
  • Appendix H.   Spill Summary, Prevention, and Response Planning
  • Appendix I.   Avoidance, Minimization, and Mitigation Technical Appendix
    • Appendix I.1.   Avoidance, Minimization, and Mitigation
    • Appendix I.2.   ConocoPhillips Road Optimization Memorandum
    • Appendix I.3.   Dust Control Plan
    • Appendix I.4.   Permittee-Responsible Wetlands Compensatory Mitigation Plan : Willow Master Development Plan (Willow Project) POA-2018-00190 Harrison Bay, Permittee-Responsible Wetlands Compensatory Mitigtion Plan, North Slope, Alaska
  • Appendix J.   National Petroleum Reserve in Alaska Integrated Activity Plan Environmental Impact Statement Traditional Knowledge Compilation
19.5 MB