Alaska LNG Project Final Environmental Impact Statement.


Author:   U.S. Department of Energy, National Energy Technology Laboratory

Cooperating agencies:   Bureau of Land Management, National Marine Fisheries Service, National Park Service, U.S. Army Corps of Engineers, U.S. Coast Guard, U.S. Department of Energy, U.S. Department of Transportation, U.S. Environmental Protection Agency, U.S. Fish and Wildlife Service.

Publication:   Washington, DC : Federal Energy Regulatory Commission, Office of Energy Projects, [2020]

March 2020.

Description:   55 PDF files : illustrations (some color), maps (chiefly color).

FERC docket number:   CP17-178-000

Report number:   FERC/EIS-0296F

Related websites:



VOLUMECONTENTSSIZE
Volume 1

•   Table of contents ; Acronyms and abbreviations ; Executive summary

•   1.   Introduction

•   2.   Project description

•   3.   Alternatives

•   4.   Environmental analysis

  • 4.1     Geologic resources and geologic hazards
  • 4.2     Soils and sediments
  • 4.3     Water resources
  • 4.4     Wetlands
  • 4.5     Vegetation
16 MB
Volume 2

•   4.   Environmental analysis (continued)

  • 4.6     Wildlife resources
  • 4.7     Aquatic resources
  • 4.8     Threatened, endangered, and other special status species
  • 4.9     Land use, recreation, and special interest areas
  • 4.10     Visual resources
  • 4.11     Socioeconomics
  • 4.12     Transportation
29 MB
Volume 3

•   4.   Environmental analysis (continued)

  • 4.13     Cultural resources
  • 4.14     Subsistence
  • 4.15     Air quality
  • 4.16     Noise
  • 4.17     Public health and safety
  • 4.18     Reliability and safety
  • 4.19     Cumulative impacts

•   5.   Conclusion and recommendations

26 MB
Appendix A Distribution List for the Draft Environmental Impact Statement227 Kb
Appendix B. Project Maps

•   Volume 1.   Gas Treatment Facilities, Point Thomson Unit Gas Transmission Line, Mainline Facilities MP 0–355

•   Volume 2.   Mainline Facilities MP 355–545

•   Volume 3.   Mainline Facilities MP 545–648

•   Volume 4.   Mainline Facilities MP 648–806 and Liquefaction Facilities

 

25.5 MB

14.5 MB

13.4 MB

9.4 MB

Appendix C Project Description Tables8 MB
Appendix D Modifications to FERC's Plan and Procedures371 Kb
Appendix E Denali Avoidance Alternative : Visual Impact Assessment12 MB
Appendix F Seismic Hazards within 5 Miles of the Compressor and Heater Stations2 MB
Appendix G Site-Specific Trenchless Crossing Plans12.6 MB
Appendix H Private and Public Water Wells Within 500 feet of the Alaska LNG Project195 Kb
Appendix I Waterbody Tables2.4 MB
Appendix J Potential Water Sources for Gas Treatment and Mainline Facilities685 Kb
Appendix K Wetlands Tables16.5 MB
Appendix L Wildlife and Fish Noise Calculated Results and Estimated Number of Vessel Trips822 Kb
Appendix M Essential Fish Habitat Assessment7 MB
Appendix N Seasonal Impacts on Fish and Alaska Department of Fish and Game In-Stream Construction Timeframes for Sensitive Fish Species273 Kb
Appendix O Biological Assessment12.5 MB
Appendix P Special Status Species Lists326 Kb
Appendix Q Recreation Areas Affected by the Project410 Kb
Appendix RLandfills, Mines, and Spill/Release Sites near the Project Area279 Kb
Appendix SVisual Resources25 MB
Appendix TRoad Crossed by the Mainline Pipeline178 Kb
Appendix UBureau of Land Management Alaska National Interest Lands Conservation Act Section 810 Preliminary Evaluation170 MB
Appendix VHealth Impact Assessment2.6 MB
Appendix WCumulative Projects8 MB
Appendix XFERC Staff's Recommended Mitigation from the Draft Environmental Impact Statement Agreed to by AGDC236 Kb
Appendix YBureau of Land Management Recommended Mitigation Measures179 Kb
Appendix ZReferences1 MB
Appendix AAList of Preparers68 Kb
Appendix BBIndex237 Kb
Appendix CCComments on the Draft EIS (Environmental Impact Statement) and Responses
Appendix
CC-1 to CC-108
•   Table of contents ; Introduction

•   Comment Meetings CM1 to CM4 : Utquiagvik, Trapper Creek, Healy, Nikiski

Note: The transcript pages are not searchable by keyword (no OCR--optical character recognition)

25 MB
Appendix
CC-108 (cont.) to CC-160
•   Comment Meetings CM5 to CM6 : Fairbanks, Anchorage

Notes: The first page is also numbered CC-108.   Only the comment pages are searchable by keyword (OCR--optical character recognition)

8.4 MB
Appendix
CC-161 to CC-208
•   Comment Meeting CM7 : Written Comments27.6 MB
Appendix
CC-209 to CC-239
•   Federal Agencies : FA1. U.S. Environmental Protection Agency -- FA2. U.S. Army Corps of Engineers13 MB
Appendix
CC-240 to CC-297
•   Federal Agencies : FA3. U.S. Department of the Interior24 MB
Appendix
CC-298 to CC-332
•   State Agencies : SA1. Senator Cathy Giessel, Senate District N -- SA2. Alaska Department of Natural Resources and others21.6 MB
Appendix
CC-333 to CC-354
• SA2. Alaska Department of Natural Resources and others (continued)23 MB
Appendix
CC-355 to CC-380
•   SA2. Alaska Department of Natural Resources and others (continued) -- SA3. Senator Click Bishop -- SA4 Representative Gary Knopp, District 30 -- SA5. Senator John Coghill21.7 MB
Appendix
CC-380 (cont.) to CC-443
•   Local Governments : LG1. City of Valdez -- LG2. Matanuska-Susitna Borough -- LG3. Denali Borough -- LG4. Kenai Peninsula Borough -- LG5. City of Kenai -- LG6. City of Soldotna -- LG7. Matanuska-Susitna Borough (continued)

Notes: The first page is also numbered CC-380.   The transcript pages are not searchable by keyword (no OCR)

16 MB
Appendix
CC-444 to CC-493
•   Local Governments : LG8. City of Valdez (continued) -- LG9. City of Soldotna (continued) -- LG10. Kenai Peninsula Borough (continued) -- LG11. Matanuska-Susitna Borough (continued)11 MB
Appendix
CC-494 to CC-510
•   Alaska Native Corporations : ANC1. Ahtna, Incorporated -- ANC2. Doyon -- ANC3. Cook Inlet Region -- ANC4. Tyonek Meeting

Note: The transcript pages are not searchable by keyword (no OCR)

5.5 MB
Appendix
CC-511 to CC-595
•   Companies and Organizations : CC01 to CC2226.4 MB
Appendix
CC-596 to CC-634
•   Companies and Organizations : CC23 to CC2516.4 MB
Appendix
CC-635 to CC-684
•   Companies and Organizations : CC26. Earth Justice14 MB
Appendix
CC-685 to CC-760
•   Companies and Organizations : CC27. Center for Biological Diversity

Note: The transcript pages are not searchable by keyword (no OCR)

17 MB
Appendix
CC-761 to CC-795
•   Companies and Organizations : CC28 to CC3013 MB
Appendix
CC-796 to CC-888
•   Individuals : IND1 to IND3021 MB
Appendix
CC-889 to CC-982
•   Individuals : IND31 to IND6018.7 MB
Appendix
CC-983 to CC-1040
•   Applicant A1. Alaska Gasline Development Corporation

Note: The transcript pages are not searchable by keyword (no OCR)

22.7 MB
Appendix
CC-1041 to CC-1085
•   Applicant A1. Alaska Gasline Development Corporation (continued)26.3 MB
Appendix
CC-1086 to CC-1119
•   Applicant A2 and A3. Alaska Gasline Development Corporation (continued)

Note: The transcript pages are not searchable by keyword (no OCR)

17.2 MB