Southcentral Railbelt area, Alaska, interim feasibility report, hydroelectric power and related purposes for the upper Susitna River basin / prepared by the Alaska District, Corps of Engineers, Department of the Army.

[Anchorage, Alaska? : Alaska District, Corps of Engineers, Dept. of the Army, 1975-1976]

4 v. : ill., maps (some folded) ; 27 cm.


 

LINKS VIA ARLIS DOCUMENT SERVER:

APA Number SUS Number Content Size
2360 The whole set? *
2972 or 2361442 **

The study and report

•   The study and report (Original and revised pages interfiled)
9.9 MB
•   The study and report (Original) 8.4 MB
•   The study and report (Both sets of revised pages only) -- Revision pages "Syllabus" through p. 102 marked as "Revised 1 Jun 1976" and revision pages 113-125 marked as "R - 1 Jun 76.") 6.2 MB
2973 or 2362 Appendix 1, pt. 1 129 MB
2974 or 2364 *** Appendix 1, pt. 2 70 MB
2975 or 2363 *** Appendix 2, Pertinent correspondence and reports of other agencies2.6 MB

*       The Susitna Hydroelectric Project document index lists the title for set as 2360 (the same title used for the entry for the first volume), but gives it as 350 pages (the same as for appendix 1, part 1).   It is uncertain whether this number refers to the whole set, to "The study and report" volume, or to appendix 1, pt. 1.

**     The volume called 'The study and report' with revised pages (up to p. 125) is assigned AEIDC document no. SUS 442 according to the Susitna Aquatic Impact Assessment Project bibliography.

***   Note that the numbering is out of order.