Before the Federal Energy Regulatory Commission, application for license for major project, Susitna Hydroelectric Project / [prepared by Acres].

[Anchorage] : Alaska Power Authority, [1983]

10 volumes in 20 : ill., maps ; 28-28 x 44 cm.



1982 versions:   Earlier versions of these volumes were issued in 1982 with varying edition statements.   They are cataloged separately.   See cataloging records for:

  • APA 1370 - Exhibit A : 1st draft
  • APA 1371 - Exhibit B : 1st draft
  • APA 163   - Exhibit B : Draft
  • APA 1372 - Exhibit C : 1st draft
  • APA 1373 - Exhibit D : 1st draft
  • APA 167   - Exhibit D : Draft
  • APA 157-161 - Exhibit E : Draft
  • APA 164   - Exhibit G : Draft

1984 versions:   After the publication of the complete 1983 set, some volumes were revised.   They are cataloged separately.   See cataloging records for:

  • APA 1459 - Exhibit F : Preliminary draft document, April
  • APA 1921 - Exhibit F : Preliminary, August

1985 version:   A finalized draft of the application was issued in 1985 (click here).


LINKS VIA ARLIS DOCUMENT SERVER:



Notes on the table:   The volumes in the table are listed by volume number and exhibit order that seems most logical.   As a result, some volumes are out of APA or SUS numbering order.   Also, note that the publishing agency numbered the volumes sometimes out of Exhibit order.

APA NumberSUS Number ContentSize
123 or
637 or
1792
140 or 192 Volume 1

  • Initial statement
  • Exhibit A. Project description
  • Exhibit C. Proposed construction schedule
  • Exhibit D. Project costs and financing
  • Appendix D-1. Fuels pricing studies

7 MB
637Volume 1, Revised draft of Exhibit D
This standalone volume is a revised draft of volume 1 with the same title information as the final, but contains only Exhibit D.   It has a page of revision notes and some pages are dated "(Revised 7/11/83)."   Series statement from label on cover: Harza-Ebasco Susitna Joint Venture document ; no. 637.
26 MB
124 or
638 or
1793
141 or 193 Volume 2

Exhibit B. Statement of project operation and resource utilization

  • Chapter 1. Damsite selection
  • Chapter 2. Alternative facility design, processes and operations
  • Chapter 3. Description of project operation
  • Chapter 4. Dependable capacity and energy production

9.6 MB
639 or
1794
194 Volume 2A

Exhibit B

  • Chapter 5. Statement of power needs and utilization
  • Chapter 6. Future Susitna Basin development

6.5 MB
1795 195 Volume 2B

Man-in-the-Arctic Program (MAP) technical documentation report

Alternative distribution with attached Harza-Ebasco series label.   (The cover and preliminary pages varied.   As all other text is identical, only the different pages are available in this file.)

10.6 MB
1796 196 Volume 2C

Red model (1983 version) technical documentation report

Alternative distribution with attached Harza-Ebasco series label.   (The cover and preliminary pages varied.   As all other text is identical, only the different pages are available in this file.)

7.3 MB
125 or
1797
142 or 197 Volume 3

Exhibit F

5.6 MB
484 or
1798
198 Exhibit F

Supporting design report (preliminary)

4.2 MB
126 or
1799
143 or 199 Volume 4

Exhibit G

5 MB
127 or
1800
144 or 200 Volume 5A

Exhibit E

  • Chapter 1.   General description of the locale
  • Chapter 2.   Water use and quality

11.8 MB
1800 app. *189 Exhibit E, Appendix E.2.A   [this is appendix A (the only appendix) to Chapter 2]

Relationship between main channel flow and slough physical habitat variables

The attachment to this appendix is APA 1802 (SUS 187 or 202).

*   Numbering assigned by Alaska Resources Library and Information Services (ARLIS).

11.4 MB
128 or
1801
145 or 201 Volume 5B

Exhibit E, Chapter 2. Figures

26.5 MB
1802187 or 202 Reference report attachment to appendix E.2.A

Incremental flow analysis of mainstem Susitna River effects on selected side sloughs : Exhibit E.

8.2 MB
190 Exhibit E : Responses to supplemental information requests. Chapter 2, nos. 2, 4, 15-19, 25-27, 32, 38, 44, 50, 51 ; Chapter 3, nos. 1-15 (not yet available ; not cataloged)
129 or
1803
146 or 203 Volume 6A

Exhibit E

  • Chapter 3. Fish, wildlife and botanical resources

Has seven-page summary: Summary of botanical resources section, Exhibit E, Chapter 3 of the Susitna Hydroelectric Project FERC license application. (APA 1140)
13 MB
130 or
1804
147 or 204 Volume 6B

Exhibit E

  • Chapter 3. Figures

41 MB
131 or
1805
148 or 205 Volume 7

Exhibit E

  • Chapter 4. Historic and archeological resources
  • Chapter 5. Socio-economic impacts
  • Chapter 6. Geological and soil resources

Note about the microfiche version:   The filming marked SUS 205 is a complete 10-fiche set.   The filming marked SUS 148 is a 4-fiche set that contains portions of the last half of chapter 5 ([skips the first half], pages 95-139 and the references, [skips tables and most figures], figures 5.5.7 to 5.5.10, [skips appendices]) and all of chapter 6.

17.3 MB
132 or
1806
149 or 206 Volume 8

Exhibit E

  • Chapter 7. Recreational resources
  • Chapter 8. Aesthetic resources
  • Chapter 9. Land use

33.7 MB
150 or
1807
207 Volume 9

Exhibit E

  • Chapter 10. Alternative locations, designs, and energy sources

5.9 MB
151 or
1808
208 Volume 10A

Exhibit E

  • Chapter 11. Text and appendices A through H. Agency consultation

18.5 MB
152 or
1809
209 Volume 10B

Exhibit E

  • Chapter 11. Appendices I through J. Agency consultation

15.4 MB